Standard Construction Drawings
TopWith building regulations changing every 3 years and the efficiency of buildings becoming a higher priority within these changes, achieving the right new-build or retrofit solution at an acceptable cost can be a challenge.
To help the construction industry reduce these costs we have produced a series of standard construction details which help maximise the fabrics contribution in SAP.
Anyone using these details, and crucially all the products specified within the details, will find passing SAP testing much easier, for three key reasons:
- Using these drawings reduces the need to use default SAP figures
- These drawings make some very simple, but significant, changes to standard build methods which mean the fabric can be used to its maximum capability
- The drawings have been independently tested and verified by BRE and …
With this information available to designer and specifier, it should make keeping abreast of the changes considerably easier.
There are no simple right answers any more but these details and the findings from them will provide a simple base line for all domestic construction.
