Sustainable Building Solutions logo

Sustainable Building Solutions

For sales enquiries
0844 822 0700
Sustainable Building Helpline
0800 688 8388

Overview

Top

The Travis Perkins Group can provide all your training and product needs for your sustainable project. The following checklists provide a reminder of key products required for various installations:-

Installation of photovoltaic cells

Top

Travis Perkins Group has everything you need to complete a Solar PV installation. We provide Installer training courses and products listed below:

5 Essential Photovoltaic Items

Item Key considerations before purchase
Module (Panel)

Required module output?

Module dimensions?

Module cost?

Module Mounting kit

Above roof mounted?

Integrated in roof?

Ground mounted?

Flat roof (A frame)?

Inverter

Compatible with size or array?

Generation meter

Location of meter (customer must have access to meter reading)

DC Wiring and connectors

Cable size

Wiring configuration of array.

Don't forget

DC and ac isolators

Warning labels

Consumer unit

RCD

MCB

AC wiring

DC and AC testing kit

Irradiance Meter

Cable entry roof tiles

Installation of solar hot water items

Top

Travis Perkins Group provides Installer training courses and products listed below:

5 Essential Hot Water Items

Key Consideration: What type of system, Sealed or Drain back?

Item Key considerations before purchase
Collector

Type of collector (flat plate or evacuated tube)?

Required collector output?

Collector dimensions?

Collector cost?

Collector Mounting kit

Above roof mounted?

Integrated in roof?

Ground mounted?

Flat roof (A frame)?

Hot water cylinder

Sealed or open vent?

How many coils?

Compatible with demand?

Cylinder dimensions?

Pump set

Compatible with collector size?

Recovery period and cylinder size?

Electrical controls

Compatible with collector, cylinder and pump set?

Don't forget

Flexible pipework and fittings

Insulation

Clips

Glycol for sealed systems

Filling pumps

Air vents

Pipe clips

Possible buffer vessel

Pipe entry flashings on roof

Installation of ground source heat pump items

Top

Travis Perkins Group provides Installer training courses, Site Assessment services and products listed below:

5 Essential Ground Source Heat Pump Items

Key Consideration: What type of heating system is in the property?

Item Key considerations before purchase
Size of Heat Pump

Required output for heat pump (full or part load)?

Ground collector type and size

Available ground collector area to match heat pump?

Buffer vessel

What is heat pumps main load, hot water, heating or both?

Controls

Heat pump, buffer vessel, central heating, hot water, outside temperature compensation?

Glycol and filling pump

Ready mix or self-mix?

Size of pump?

Don't forget

Heat pump collector manifold

Insulation

Under floor heating

Electrical connections

Installation of air source heat pump items

Top

Travis Perkins Group provides the products you need to complete your job.

5 Essential Air Source Heat Pump Items

Key Consideration: What type of heating system is in the property?

Item Key considerations before purchase
Size of Heat Pump

Required output for heat pump (full or part load)

Heat pump location

Will effect heat pump efficiency and noise

Buffer vessel

What is heat pumps main load, hot water, heating or both?

Controls

Heat pump, buffer vessel, central heating, hot water, outside temperature compensation, bivalent operation controls

Glycol

Ready mix or self-mix if external run of pipework is required

Don't forget

Heat pump collector manifold

Insulation

Under floor heating

Electrical connections